An Atlantic Gesture by Bachmann Europe

Last modified date

On Saturday 8th June 2019, Bachmann Europe Plc visited the Bluebell Railway during its Atlantic House Open Weekend to present a cheque for £10,617.50 to the Bluebell Railway Atlantic Group. Following the release of the acclaimed Bachmann Branchline OO scale model of the H2 Class Atlantic locomotive in 2018, the donation was made in recognition of the assistance provided by the group during the development of the Branchline model. The model was first announced during the 2013 Bachmann Collectors Club Members Day which was held at the Bluebell Railway and during which club members were able to see the development of the full-size locomotive for themselves.

Richard Proudman from Bachmann Europe presents the cheque to Atlantic
Project Chairman, Terry Cole (left) and Secretary, David Jones (right).

In October 2000 the Bluebell Railway announced its intentions to build a new H2 Atlantic locomotive, based on No. 32424 ‘Beachy Head’ (the original ‘Beachy Head’ had been withdrawn in 1958), at which point it had already amassed several key components including a boiler (from a GNR Atlantic), a tender chassis (from a LBSCR B4) and tender wheelsets and axleboxes (from a LBSCR C2X). The project continues apace, and it is hoped that the locomotive will enter service on the Bluebell Railway during 2021.

After handing over the cheque, Richard Proudman spoke to David Jones to find out the latest progress on the project, watch the full video below.

For further information on the new-build locomotive visit the Bluebell Railways Atlantic Group Page.

Administrator

Share